3596-22-007 Express Snack Avenue Updates #15632

Biloxi, MS (G-NR)

Status

Accepting Bids

Bid Date5/10/24 2:00pm

Company & Contacts

Burman Companies
Jonathan Roberts (Burman Companies)  
417-581-0304

Location

Keesler Air Force Base

SUB/SUPPLIER PRICING ONLY

1.1 STATEMENT OF WORK

A. The work covered by these specifications consists of furnishing all plant, supervision, labor, equipment, materials and incidentals necessary to perform all operations required to complete the work, all in accordance with these specifications and the applicable drawings, and subject to the terms and conditions of the contract.

B. The work to be performed is located at the Keesler AFB in Biloxi, MS

C. Principal Features:

1. The work to be performed in connection with this project includes but is not limited an Image Upgrade to the Keesler AFB Express located at the northwest corner of Meadows Drive and Larcher Avenue
2. Improvements will include the following:

a. Selective demolition to remove the existing brand wall finishes, equipment, flooring and ceilings
b. Remove existing floor tile
c. Concrete grind and polish floor finish
d. Add QSR with CHOPZ and Hunt Brothers Pizza
e. Coordinate casework installation with AAFES casework contractor
f. Renovate restrooms
g. New framed walls for revised spatial configuration
h. Paint walls, soffits, and gypsum board ceilings
i. New AAFES provided equipment
j. Cooler/freezer front panel and reach-in door replacement and associated equipment by AAFES
k. Add level concrete topping for new exterior freezer box
l. Add opening in exterior wall in MPA for access to new freezer box
m. Add new exterior freezer box and condenser by AAFES
n. Minor side wall repair to cut in openings for new exhaust fan
o. Make domestic water changes for new QSR and Snack Avenue
p. Make sanitary drain changes for new QSR and Snack Avenue
q. Make HVAC ductwork and diffuser changes
r. Add a new Type II exhaust hood and fan in QSR
s. Electrical power and lighting
t. Modify the fire sprinkler head locations as required
u. Reskin fuel station canopy
v. Repaint fuel station columns
w. New monument sign footing and power.
x. Coordinate monument sign installation with AAFES signage contractor

D. The Contractor is advised to take note of the following General Provisions of the Contract:
Cleaning up; Material and Workmanship; Accident Prevention; Protection of Existing Vegetation, Structures, Utilities and Improvements; Operation and Storage Areas; Site Investigation; Permits and Responsibilities. Copies of the General Provisions may be obtained from the Contracting Officer.